浏览 2373 次
锁定老帖子 主题:quartz学习笔记二(example2)
精华帖 (0) :: 良好帖 (0) :: 新手帖 (0) :: 隐藏帖 (0)
|
|
---|---|
作者 | 正文 |
发表时间:2010-11-03
最后修改:2010-11-03
一 JobDetail的构造方法 JobDetail的构造方法相对比较简单
public JobDetail(String name, String group, Class jobClass) { setName(name); setGroup(group); setJobClass(jobClass); }
二 SimpleTrigger 的构造方法 下面这个是比较全面的构造方法
/** * <p> * Create a <code>SimpleTrigger</code> that will occur at the given time, * fire the identified <code>Job</code> and repeat at the the given * interval the given number of times, or until the given end time. * </p> * * @param startTime * A <code>Date</code> set to the time for the <code>Trigger</code> * to fire. * @param endTime * A <code>Date</code> set to the time for the <code>Trigger</code> * to quit repeat firing. * @param repeatCount * The number of times for the <code>Trigger</code> to repeat * firing, use {@link #REPEAT_INDEFINITELY}for unlimitted times. * @param repeatInterval * The number of milliseconds to pause between the repeat firing. */ public SimpleTrigger(String name, String group, String jobName, String jobGroup, Date startTime, Date endTime, int repeatCount, long repeatInterval) { super(name, group, jobName, jobGroup); setStartTime(startTime); setEndTime(endTime); setRepeatCount(repeatCount); setRepeatInterval(repeatInterval); } 三.在调度器启动后仍然可以添加新的任务和触发器
sched.start(); // jobs can also be scheduled after start() has been called... // job7 will repeat 20 times, repeat every five minutes job = new JobDetail("job7", "group1", SimpleJob.class); trigger = new SimpleTrigger("trigger7", "group1", "job7", "group1", new Date(ts), null, 20, 300000L); ft = sched.scheduleJob(job, trigger); 四.可以设置任务立即执行
// jobs can be fired directly... (rather than waiting for a trigger) job = new JobDetail("job8", "group1", SimpleJob.class); job.setDurability(true); sched.addJob(job, true); sched.triggerJob("job8", "group1"); 声明:ITeye文章版权属于作者,受法律保护。没有作者书面许可不得转载。
推荐链接
|
|
返回顶楼 | |
发表时间:2010-11-03
五.更换触发器
trigger = new SimpleTrigger("trigger7", "group1", "job7", "group1", new Date(), null, 10, 1000L); ft = sched.rescheduleJob("trigger7", "group1", trigger); |
|
返回顶楼 | |
发表时间:2010-11-06
不久前项目中用过。。。
|
|
返回顶楼 | |