一、业务过程
1. Create Stock transport Order - ME21N
2. Fast Display Purchase Orders - VL10B
3. Change Delivery, Picking and Post Goods Issue - VL02N
4. Once you do PGI, Goods will be in Transit - MB5T(Report)
5. Goods Receipt in the receiving plant - MIGO with reference to outbound delivery (delivery number created in step above)
6.If the stock transfer is between cross company codes, then you have to do Billing - VF01 (supplying plant)after post goods issue (after step-3)
7.Invoice Verification - MIRO (receiving plant)is the last step ie step-6.
二、配置和数据准备
The following steps have to be followed in order to configure stock transport order between two plants.
1. Create a vendor for the Company code of the receiving plant using account group 0007 via T-Code XK01.
2. In the purchasing data view assign the supplying plant (Menu:Extras->Add Purchasing Data)and the schema group.
3. Create a customer (receiving plant as acustomer for company code and sales areaof supplying plants via T-Code XD01
4. The shipping conditions, the delivering plant and the transportation zone determine the route in the STO.
5. In the pricing procedure determination relevant to the STO assign document pricing procedure and customer pricing procedure to get the pricing in the invoice.
6. Maintain carrier as a partner in the customer master.
7. Assign this customer number in receiving plant details OMGN
Path:Materials Management->Purchasing->Purchase Order->Set up Stock Transport Order
8. Assign supplying sales area in supplying plant details OMGN
Path:Materials Management->Purchasing->Purchase Order->Set up Stock Transport Order
9. Assign the delivery type and checking rule to the document type.
10. And finally, assign the purchasing document type to the supplying plant and the receiving plant.
11. Material should be maintained in both supplying and receiving plant MM01
12. Stock should maintain only in supplying plant MB1C
13. Create Information Record Via T-CODE: ME11
14. Maintain condition records for pricing condition. Via T-Code : VK11
15. Create Source List Via T-CODE: ME01
16. Create the STO using T-Code ME 21N and save.
17. Check for release strategy if any and release using T-Code ME 28.
18. Create delivery in background using VL10G.
19. If delivery is created, it is an indication of correct configuration and master data creation.
三、相关链接
http://www.sap-basis-abap.com/sd/what-is-stock-transfer-order.htm
http://yodrak.spaces.live.com/blog/cns!BA48F47056E55059!317.entry
http://www.feedmap.net/blog/free-sap-fico-mm-sd-hr-pm-ps-pp-material-nellore-andrapradesh/0CCFC21F8657BEBCED1D68FA30A093D8.aspx
https://www.sdn.sap.com/irj/scn/thread?messageID=6313887
http://help.sap.com/saphelp_47x200/helpdata/en/4d/2b90dc43ad11d189410000e829fbbd/frameset.htm
分享到:
相关推荐
### SAP STO步骤和配置详解 #### 一、业务流程 **STO(Stock Transport Order)**即库存转储订单,是SAP MM模块中用于跨工厂或跨公司代码之间进行物料转移的一种特殊订单类型。它能够实现从一个工厂到另一个工厂的...
在SAP系统中,MM(Materials Management)模块用于管理企业的物料和采购流程,而STO(Stock Transfer Order)则是该模块中的一个关键功能,用于处理内部库存转移,包括工厂间的库存移动。STO业务流程涉及多个步骤和...
这个过程涉及到多个步骤,包括配置、订单创建、库存移动、交货处理和发票结算。下面我们将详细介绍SAP STO的整个流程。 1. **公司间转移过帐介绍** 公司间调拨是集团内不同工厂之间转移物料的一种方式,通常用于...
这些业务的配置涉及多个SAP模块,如SD(销售与分销)、MM(物料管理)、PP(生产计划)和FI(财务会计)。IDOC(Intermediate Document)是SAP系统间数据交换的关键,用于自动化公司间业务的过账。理解并熟练配置...
UB类型的STO会产生销售订单和采购订单,确保库存和财务的一致性。在财务上,会记录发货和接收的过账。 4. **NB类型的标准采购订单** - 这种方式同样适用于跨工厂调拨,但需要在供应商主数据中维护接收工厂信息。它...
通过以上步骤,可以逐步优化设计方案,最终实现一个满足所有技术指标的双分离望远物镜。 综上所述,光电实验中的双分离物理镜设计不仅涉及到光学基础知识的应用,还需要借助专业软件如ZEMAX进行复杂的模拟和优化...
2. **镜头数据设置**:在STO(Surface Thickness and Optical Properties,表面厚度与光学特性)上,我们配置反射镜的曲率半径、厚度和材料属性,如MIRROR代表镜面材质。 3. **更改反射面形状**:通过调整STO的Conic...
### SAP-FMS快速指南知识点详解 ...通过合理的配置和使用,企业不仅能够提高效率,还能够在竞争激烈的市场中保持优势。以上内容涵盖了应用变体的基本概念、设置步骤以及实际操作方法,希望能为企业用户提供实用的指导。
每个习作都详细介绍了Zemax软件的操作步骤,包括设置波长、输入镜头数据、生成光线图、OPD图、斑点图、定义厚度求解和变量,以及执行简单的光学设计优化。 在习作一开始,读者将学习如何设计一个F/4的单镜片,焦距...