Although there are most concept and experience from the PMP or other PM books.
Actually, it sill depends on the working experiences.
- Brave to make decision
To balance, will you sepend 1hrs to review and confirm the report , which submit by your team mates?
If it would not affect too much, use 1mins to make the decision.
Manager always has risk to make decision, but need to balance to make sure that the direction is correct.
- How to push the same level ppl to work for you
Every time, if you need the same position to work for you. How to push them? Blame them?
Sit down, work togather, find the resource to help him. Find the difficulties.
In the <art of PM<art of="" pm=""></art>>, every time, you found the mistake, find the lesson first. Noted, blame is no use.
分享到:
相关推荐
The diagram included at the top represents the address partitioning for the 32-bit version of Windows 2000. Typically, the process address space is evenly divided into two 2-GB regions. Each process...
The guide addresses the common debate between referring to the operating system as "Linux" versus "GNU/Linux." This distinction is important because the Linux kernel is just one component of the ...
(21KB)<END><br>34,multitop.zip MULTITOP shows how to write an SDI application which has multiple top level windows and uses the MFC doc/view architecture.(30KB)<END><br>35,njfind16.zip This 16-...
### Toad for Oracle 使用手册关键知识点总结 #### 一、简介与新特性 - **Toad for Oracle**:是一款强大的数据库开发与管理工具,适用于Oracle数据库...- **Export Tables, Views, SQL Queries from the Command ...